Project Overview
Manufacturer of consumer products, the company developed a modern warehouse in Lahore as regional hub for distribution in Punjab area. Forklift with 4-ton load capacity with hard wheel is to be used for movement of load.
Forklift requires even surface with high abrasion and impact resistance for safe movement of load. Duracrete Fibre was selected to reinforce concrete floor based on past successful performance at Colgate warehouse in Kotri, Sindh.
Benefits Realized
- Three dimensional reinforcement
- Corrosion Free material
- Major cost saving in replacing steel rebar
- Fast track construction in comparison to steel that requires placement and concrete cover
- Hard concrete surface with improved abrasion and impact resistance (up to 14 times more than normal concrete)
Project Gallery
Industrial Flooring Detail
- Thickness: 4 inch finish floor
- Panel Size: 10 x 12 feet
- Design Mix: A-3 (1:11/2: 3)
- Consultant: SMK Associates
- Contractor: Construction Techniques