Project Overview
Huffaz Seamless Pipe is located over 600 acres in Nooriabad, on Superhighway between Karachi & Hyderabad. The manufacturer is expanding its facility for a new coating plant and warehouse.
The coating plant flooring (343,000 sq ft) required a durable finished floor to handle concentrated steel load as well as exposure corrosive chemicals used in the process.
Benefits Realized
- Three dimensional reinforcement
- Major cost saving (60%) by replacing 200-ton steel
- Fast track construction in comparison to steel that requires placement and concrete cover
Hard concrete surface with improved abrasion and impact resistance (up to 14 times more than normal concrete) - Corrosion Free material
Project Gallery
Concrete Pavement Detail
- Size: 30 meter x 306 meter (3 buildings)
- Thickness: 9 inch
- Panel Size:10 x 10 feet
- Consultant: Kamil Associates